Details
Project name:
Teco mainline harding project
Project description:
Boring 2 6" conduits under I 275 at 35 feet depth.
Project location:
I275 and Sinclair
Equipment used:
Vermeer 40/55.
Materials used:
6" bore guard
Project condition:
Night and day work. Crossing a heavily trafficked interstate. Reaming and pulling 2 6" Conduits. Very challenging and tight location.
Overview
A contemporary pavilion designed as a multifunctional public venue for exhibitions, community gatherings, and seasonal events. Its sculptural form is expressed through layered volumes and filtered daylight, creating a calm and adaptable interior. The structure is engineered for flexibility, enabling seamless transitions between uses while maintaining strong visual identity and a sense of civic presence within the surrounding landscape.


More projects